Solesca blog

Explainers from Solesca for the engineers and developers who work with the numbers, and below them the coverage Solesca did not write: trade press on product launches and integrations, a California Energy Commission staff review, and recognition from the U.S. Department of Energy, with links to the originals.

What has Solesca published?

Solesca writes explainers for the engineers and developers who work with the numbers. These are ours, newest first, in English; everything after them was written by others.

Where AI belongs in solar design, and where it doesn’t (November 2026). Which design tasks run on AI, which run on NEC-checked math, and why in-house tools stall.

PVsyst near shading export: build the scene once, in your layout tool (November 2026). What the .PVC scene and the PVsyst project zip carry, how long a hand-built scene takes, and what Onyx Renewables saved.

P50 vs P90 explained for commercial solar projects (October 2026). What each means, which one lenders use, and where the gap between them comes from.

How long does a solar interconnection plan set take? (October 2026). What an outsourced plan set costs, what goes in one, and what the utility needs from you.

What has the trade press covered?

Solar Power World has covered Solesca four times: the engineering mode launch (April 2026), the ARGUS AI auto-obstruction detection launch (December 2025), the DNV SolarFarmer integration (September 2025), and the ETB Developer integration (November 2024).

Solar Builder reported on the Energy Toolbase partnership in January 2025, and Energy Toolbase has written about the Solesca integration on its own blog, including the ETB Developer launch announcement.

What does the public record say?

In August 2025, California Energy Commission staff published a review recommending the Solesca tool for certification under the 2022 Energy Code, reported by Solar Power World and published at energy.ca.gov. A staff review by a state energy regulator is a different class of evidence from a press release, which is why it also anchors the validation page.

Solesca was a finalist in Round 6 of the U.S. Department of Energy's American-Made Solar Prize in 2023.

Where can you follow what Solesca ships?

Product releases land in the release notes first, with 220+ dated entries since January 2024; the changelog page explains how to read that record. For press inquiries, book a call and we will connect you with the right person.

Writing about pre-CAD solar design?

Book 30 minutes and we will show you the platform the coverage is about, with a real project on screen.